Develop Electricity Projects and Transmission lines in a 'War Footing'

Authors

  • Jeewan Prasad Thanju Editor-in-chief

Keywords:

Not availabe

Abstract

Not available. 

DOI: http://dx.doi.org/10.3126/hn.v14i0.11243

Hydro Nepal Journal

Journal of Water, Energy and Environment

Vol. 14, 2014, January

Page:7-7

Abstract
632
PDF
0

Author Biography

Jeewan Prasad Thanju, Editor-in-chief

HYDRO Nepal Journal

Downloads

Published

2014-10-13

How to Cite

Develop Electricity Projects and Transmission lines in a ’War Footing’. (2014). Hydro Nepal: Journal of Water, Energy and Environment, 14, 7-7. https://doi.org/10.3126/hn.v14i0.11243

Issue

Section

Editorial

How to Cite

Develop Electricity Projects and Transmission lines in a ’War Footing’. (2014). Hydro Nepal: Journal of Water, Energy and Environment, 14, 7-7. https://doi.org/10.3126/hn.v14i0.11243