[1]
2012. Evaluation on the Potential Use of Shotcrete Lined High Pressure Tunnel at Upper Tamakoshi Hydroelectric Project. Hydro Nepal: Journal of Water, Energy and Environment. 10, (Dec. 2012), 73–80. DOI:https://doi.org/10.3126/hn.v10i0.7118.