(1)
The 400 KV Dhalkebar-Muzaffarpur 140 Km Transmission Line Eight Years of Indo-Nepal Labor and Still No Fruit. Hydro Nepal 2014, 14, 77-82. https://doi.org/10.3126/hn.v14i0.11273.