Evaluation on the Potential Use of Shotcrete Lined High Pressure Tunnel at Upper Tamakoshi Hydroelectric Project. (2012). Hydro Nepal: Journal of Water, Energy and Environment, 10, 73-80. https://doi.org/10.3126/hn.v10i0.7118