“The 400 kV Dhalkebar-Muzaffarpur 140 km Transmission Line Eight Years of Indo-Nepal Labor and Still No Fruit” (2014) Hydro Nepal: Journal of Water, Energy and Environment, 14, pp. 77–82. doi:10.3126/hn.v14i0.11273.