[1]
“The 400 kV Dhalkebar-Muzaffarpur 140 km Transmission Line Eight Years of Indo-Nepal Labor and Still No Fruit”, Hydro Nepal, vol. 14, pp. 77–82, Oct. 2014, doi: 10.3126/hn.v14i0.11273.