Prasad, Rajeev, and Nishith Sharma. “Engineering Geological and Geotechnical Approaches for the Construction of Powerhouse Cavern of Tehri Pumped Storage Plant (1000 MW) - A Case Study”. Hydro Nepal: Journal of Water, Energy and Environment 24 (April 10, 2019): 35–44. Accessed April 25, 2024. https://www.nepjol.info/index.php/HN/article/view/23582.