(1)
Adhikari, S.; Ghimire, B.; Shrestha, G. B.; Basnet, C. B. Comparison of Tunnel Construction Cycle Time With NTNU Model: A Case Study of Siddhababa Road Tunnel, Palpa, Nepal. Tech J 2025, 5, 75-80.