Comparison of Tunnel Construction Cycle Time with NTNU Model: A Case Study of Siddhababa Road Tunnel, Palpa, Nepal. (2025). Technical Journal, 5(1), 75-80. https://doi.org/10.3126/tj.v5i1.86893