[1]
“Comparison of Tunnel Construction Cycle Time with NTNU Model: A Case Study of Siddhababa Road Tunnel, Palpa, Nepal”, Tech J, vol. 5, no. 1, pp. 75–80, Nov. 2025, doi: 10.3126/tj.v5i1.86893.