1.
Dahal D, Kumar Bhattarai S, Shrestha R, Khanal P, Acharya S. Evaluating the Alignment between Intended Project Durations and Standard Time Cost Models: A Comparative Analysis in Basic Hospital Construction Projects in Nepal. Int. J. Engin. Technol. 2024;1(2):211-229. doi:10.3126/injet.v1i2.66688