(1)
Analysis of Payment Delay in Road Construction Projects: The Case Road Division Surkhet, Nepal. Int. J. Eng. Technol. and Infras. Dev. 2024, 1 (1), 36-51. https://doi.org/10.3126/injet-indev.v1i1.67935.