“Construction Safety Practice on Pre-stressed Bridge Construction: A Case Study of Parasi District” (2024) International Journal on Engineering Technology and Infrastructure Development, 1(1), pp. 69–78. doi:10.3126/injet-indev.v1i1.67938.