[1]
Shakya, A.C. et al. 2025. Limit state design of a single-span PSC box Girder Bridge for a seismically active Hilly River crossing: Case study of the Mardi River, Nepal. Journal of Innovations in Engineering Education. 8, 1 (Dec. 2025), 127–132. DOI:https://doi.org/10.3126/jiee.v8i1.82601.