[1]
Karn, M. et al. 2025. Evaluation of Peaking Time Variation in Power Generation of a Cascaded Hydropower System: A Case Study of Arun River. Journal of Engineering Issues and Solutions. 4, 1 (Jul. 2025), 30–40. DOI:https://doi.org/10.3126/joeis.v4i1.81562.