[1]
Koirala, R.P. 2025. Identifying And Ranking The Significant Causes Of Construction Delay In Private Hydropower Projects In Nepal. Journal of Engineering Issues and Solutions. 4, 1 (Jul. 2025), 252–266. DOI:https://doi.org/10.3126/joeis.v4i1.81582.