[1]
Gautam, H. et al. 2026. Assessment of Time and Cost Overrun of Province Level Construction Project in Tanahun, Gandaki Province, Nepal. Journal of Engineering Issues and Solutions. 5, 1 (Apr. 2026), 84–102. DOI:https://doi.org/10.3126/joeis.v5i1.93472.