(1)
Karn, M.; Pandey, V. P.; Basnyat, D. B. Evaluation of Peaking Time Variation in Power Generation of a Cascaded Hydropower System: A Case Study of Arun River. J. Eng. Iss. Solut. 2025, 4 (1), 30-40. https://doi.org/10.3126/joeis.v4i1.81562.