Karn, M., Pandey, V. P., & Basnyat, D. B. (2025). Evaluation of Peaking Time Variation in Power Generation of a Cascaded Hydropower System: A Case Study of Arun River. Journal of Engineering Issues and Solutions, 4(1), 30–40. https://doi.org/10.3126/joeis.v4i1.81562