KARN, Megha; PANDEY, Vishnu Prasad; BASNYAT, Divas B. Evaluation of Peaking Time Variation in Power Generation of a Cascaded Hydropower System: A Case Study of Arun River. Journal of Engineering Issues and Solutions, [S. l.], v. 4, n. 1, p. 30–40, 2025. DOI: 10.3126/joeis.v4i1.81562. Disponível em: https://www.nepjol.info/index.php/joeis/article/view/81562. Acesso em: 6 dec. 2025.