Karn, M., Pandey, V.P. and Basnyat, D.B. (2025) “Evaluation of Peaking Time Variation in Power Generation of a Cascaded Hydropower System: A Case Study of Arun River”, Journal of Engineering Issues and Solutions, 4(1), pp. 30–40. doi:10.3126/joeis.v4i1.81562.