Koirala, R. P. (2025) “Identifying And Ranking The Significant Causes Of Construction Delay In Private Hydropower Projects In Nepal”, Journal of Engineering Issues and Solutions, 4(1), pp. 252–266. doi: 10.3126/joeis.v4i1.81582.