Gautam, H., Gurung, S. and Ghimire, K. (2026) “Assessment of Time and Cost Overrun of Province Level Construction Project in Tanahun, Gandaki Province, Nepal”, Journal of Engineering Issues and Solutions, 5(1), pp. 84–102. doi: 10.3126/joeis.v5i1.93472.