[1]
M. Karn, V. P. Pandey, and D. B. Basnyat, “Evaluation of Peaking Time Variation in Power Generation of a Cascaded Hydropower System: A Case Study of Arun River”, J. Eng. Iss. Solut., vol. 4, no. 1, pp. 30–40, Jul. 2025.