Supply Chain Logistics in Multi-Level Just-in-Time Production Sequencing Problems

Authors

  • Gyan Bahadur Thapa Pulchowk Campus, Institute of Engineering, Tribhuvan University, P. O. Box 19758, Kathmandu
  • Sergei Silvestrov Division of Applied Mathematics, Mälardalen University, Box 883, 721 23 Vasteras

DOI:

https://doi.org/10.3126/jie.v11i1.14700

Keywords:

Just-in-time, JIT sequencing, Flows, Supply chain, Logistics

Abstract

The multi-level just-in-time sequencing problem is one of the challenging research areas in supply chain management. In this paper, we present brief review and some recent research developments of just-in-time production systems together with supply chain logistics. Observing production flows and supply chain synchronization in production process, we present the mathematical models of just-in-time (JIT) sequencing problem in multi-level and single-level as nonlinear integer programming in terms of discrepancy functions under the specified constraints. Discrete apportionment approach is briefly reported as an efficient frontier for single-level.  

Journal of the Institute of Engineering, 2015, 11(1): 91-100

Downloads

Download data is not yet available.
Abstract
1065
PDF
1127

Downloads

Published

2016-03-29

How to Cite

Thapa, G. B., & Silvestrov, S. (2016). Supply Chain Logistics in Multi-Level Just-in-Time Production Sequencing Problems. Journal of the Institute of Engineering, 11(1), 91–100. https://doi.org/10.3126/jie.v11i1.14700

Issue

Section

Articles